Rebuild planning is a sequence problem
Fire recovery projects need design ambition, but they also need a disciplined sequence. Site constraints, insurance paperwork, utility restoration, and local review can shape the plan before finishes or floor plans matter.
Early questions
- What can be reused safely on the site?
- Which approvals are required before temporary or permanent occupancy?
- How should the structure respond to wind, heat, and access constraints?
- What needs to be documented for lenders, insurers, and the city?
The first useful deliverable is a clear path through uncertainty, not a polished rendering.
